Tuesday, February 21, 2012

Paintlift

A lot of times cosmetic work can make all the difference in an older home. Admittedly, our house needs more than just cosmetic work, but there are certainly some areas where a little "paintlift" can make an incredible difference. Our hallways are one such area where a little bit of paint (ok, several gallons) can cover up a whole lotta ugly. Enter Exhibit A -- our upstairs hallway after Stuart removed the wallpaper last summer. LAST SUMMER people. That's right, we have lived with it like this for a year and a half. That's about 14 months too long in my book.




And here is a (crummy) picture of our hallway nook taken on our first visit to the house with our real estate agent exactly 2 years ago this month. That green wallpaper was in both the upstairs and downstairs hallways. Can I get a yikes?


So last summer Stuart was able to remove most of the wallpaper. But there was this bit above the stairs that we couldn't figure out how to safely get to to remove. So it sat...


and sat...


and sat.


And finally, with an urge to make our house more presentable for family visiting at Christmas, we decided to hire some guys to come remove the wallpaper AND paint the upstairs hallway and stairwell. We decided to go with Olympic's Bone White for the color. In order to save some money, we had the guys remove wallpaper and paint the walls only. We knew that although it might be painfully time consuming, we could do the trim work ourselves and put a little change back in our pockets. We were very pleased with the work that the paint crew did. After removing the remaining wallpaper, they sanded all the walls, filled all of our cracks (and let me just say, there is no shortage of cracks in our house), and painted. What would have taken us possibly weeks of a few hours here and there took our 2 guys only 2 days!



Before painting the trim, we filled nail holes with our wood filler, sanded, and cleaned the baseboards. Here are some close ups that show how grungy our baseboards and doorframes were.
 




After several coats and many hours of work, our upstairs hallway had its paintlift!


And in case you are super confused by where things are in our house, here's a little reference picture of the upstairs taken with my back to the staircase and the hallway nook directly to my left.


There was a lot of trim and a lot of doors = lots of high gloss white paint.


And here is a shot taken with my back to the master bedroom at the end of the hallway. ::sigh:: so pretty compared to what it used to be!


And a view of the nook.





For anyone wondering, we bought the small rug for the nook and the hallway runner last summer at a rug store in Blowing Rock, NC.

And for some final before and after shots....





I'd say it's a vast improvement. We still need to remove the door hardware throughout the hallway to strip it of paint and give it a new look like we did here and here. Also, we would like to get some more pictures and art on the walls, paint the hallway ceiling, change the lighting, and possibly add crown molding much farther down the road. But for now, we think our inexpensive paintlift looks like a million bucks!

We are still working on the staircase trim and have a gallery wall in progress along the stairwell, so hopefully we will be back to share an update soon!

Wednesday, January 4, 2012

Bathroom Update

Happy New Year everyone! The Mulls haven't really made any resolutions yet (and probably won't), but here's to hoping that we get more work done around the house in 2012 while maintaining our sanity. We are still working to complete the downstairs half bath that we started demo on in August and blogged about here. It has taken us longer than expected because we work in spurts and then take a few weeks off (small steps = part of our plan to maintain our sanity!). The last image we left you with was this:



Can I get a "yikes"? After freaking out about what we had done cleaning up the demo debris, we knew we would need to put some drywall up on the wall that had crumbled during demolition so that our new beadboard would have something to nail into and our walls would all be even. We measured the width of the existing plaster and then ran to Lowe's to get some drywall in the same width. After cutting down to size with a jigsaw to cut out the plumbing holes and a circular saw to trim the sides, Stuart screwed it into the wall and we once again had 4 walls. You can see the bottom corner of the drywall in the picture below (sorry, no pictures other than this one of the drywall portion of this project).

Up next on the list was tile installation. We ordered a 1" hexagon carrara marble mosaic tile from Amazon.com for around $9/sq ft. Since our bathroom was 20 sq feet, we ordered 21 sq feet of tile and came out just under $200 for the flooring. Neither Stuart nor I have any experience in tile installation, so we educated ourselves by talking to the floor guy at Lowe's and watching online videos. The tile we selected was held together by mesh and each sheet of tile was 1 sq ft. This was a very user friendly tile because the pieces were so small that we could snip the mesh if we needed to trim the tile around the toilet, air vent, etc as opposed to needing to have our tile cut. We did have some pieces of the tile cut to fit around the edges of the bathroom, but otherwise we didn't need to cut it at all. To get started, I laid out the tile in the space to be sure we had ordered enough and snipped tile from the mesh to leave an opening for the toilet plumbing and air vent. Based on the tile we selected, we used a mortar recommended by our Lowe's guy. I mixed the mortar and spread it one tile sheet at a time. I laid each sheet starting by the bathroom door and worked my way into the corner that houses the toilet, since that would be the most forgiving area once the toilet was reinstalled and covered much of the space underneath. After laying the tile in the mortar, we laid the marble threshold piece between the bathroom floor and hallway hardwoods.

 


(close up of post mortar, pre-grouted tile)


After waiting 24 hours per the instructions on the mortar, I mixed the white nonsanded grout with polymer for the tile. I am proud to say that I laid the mortar and grout all while Stuart was out of town (!!!), so I confidently say that anyone can do this with a little patience and the right supplies. Once the grout had dried for 24 hours, I sealed the floors with a sealent recommended by our Lowe's guy. I don't have a close up of the tile after it was grouted, but take the picture above and imagine the space between the tiles filled in with white grout.

Next up for the bathroom project was hanging the beadboard on all the walls. Our walls are not square, so after a lot of measuring at the top and bottom of where the beadboard would hang, we cut the beadboard to size using a circular saw (and a jigsaw for the plumbing holes). We hung each piece with finishing nails and a little nail finisher tool. Next up was measuring, cutting, and hanging the chair rail, baseboard, and shoe molding. We didn't use any fancy tool for this, just a neat piece of plastic and a saw that my dad bought for us last year that gives you the option of cutting various angles. Below are some pictures of the beadboard and trim before filling the nail holes, caulking, and painting everything high gloss white--pretty rough!





After puttying/caulking/and painting everything from the chair rail down a high gloss white, we hung the new towel bar and toilet paper holder. Then, Stuart and I watched more online clips and learned how to reinstall our toilet. I must say, I was very proud of my sweet husband for figuring this out and replacing some parts on our toilet. We decided to just reinstall our old toilet because a.) we figured that no matter what toilet we installed, it would ultimately just be a toilet and serve it's same purpose while looking similar to pretty much any new toilet and b.) we could dress it up with a new oil rubbed bronze handle and make it shine with a good Clorox scrub.




So this is where we are now. We still need to:
  • install the sink (we have bought a new sink and are waiting on our new sink hardware to come in)
  • install a new light fixture (our electrician is coming on Friday to install a wall switch--up until now the light has turned on/off with a little pull!)
  • paint the wall above the chair railing (we are painting a light gray)
  • paint the trim and medicine cabinet above the chair railing (high gloss white, what else?)
  • add handtowels, artwork, etc.
We still have a lot to do, but I'd say we have come a long way from this:


To this:


Tuesday, October 25, 2011

Hiatus

True story...we have been on a 2 month long blogging hiatus. With good reason! And leaving very little time to do any work on our home. Since the last time we posted we have been very busy. In the past two months, we have....

Been cheering on the Panthers



Made multiple trips to the mountain house to check on its progress and make final decisions



Stuart spent Labor Day in Charleston for Hunter's (my brother) Bachelor weekend--no pictures from this weekend, and I still don't even know what they did for 3 nights...I'm blissfully uninformed about the goings on, as I should be.

While Stuart was Bacheloring, I briefly tripped to Houston to see my parents for a few days while my dad was recovering from some health problems.

I celebrated Erin's (my sister-in-law!) Bachelorette in Savannah (there ARE pictures from this weekend, but none taken by me! So below is a pic from one of Erin's showers earlier in the summer)



Traveled to Columbus, GA for Erin and Hunter's wedding



Hosted my parents at our house for a few days post wedding (tiny picture of them when we took them to see the mountain house for the first time!)


Celebrated this guy's 27th birthday with a family dinner




Became Senior High youth advisors (Stuart building a wheelchair ramp for a community youth service project)



Went to PC's (our alma mater) homecoming



Stuart celebrated another Bachelor weekend with a fraternity brother (and once again, I'm not privy to Bachelor weekend photos or goings on)

Celebrated our 1 year anniversary at a B&B in Hot Springs, NC and ate our cake topper from our wedding (it still tasted really good after being frozen for a year!)


 
So I know 'tis no excuse to treat our blog like the red headed stepchild, but we are exhausted! Here's to being home nearly every weekend between now and Christmas and hoping we have the motivation to do some projects and keep this ol' blog running.

Tuesday, August 23, 2011

Live From Our Downstairs Bathroom

or, How Our Bathroom Went From Looking Like This:





To looking like this:


Oh yes we did...we started our first big renovation project last Thursday. It all started when Stuart emailed me at work saying that he just couldn't take the bathroom door getting stuck on the carpet each time he went into the bathroom and that he was going to rip up the carpet when he got home. Fine by me--the carpet was filthy and a very unattractive mauve color. Honestly, who puts carpet in a bathroom? So before I knew it, I was so excited about the project that when I beat him home, I ripped it out myself. And, although we didn't realize it at the time, thus began our bathroom renovation. We had planned to tackle this bathroom first in the category of major renovations, since it is a very small space (20 sq ft) and there was really no way to make it worse than it already was (so we thought). We figured it's a good place to start learning some DIY skills. And learn we did...after ripping up the carpet, there was a layer of linoleum glued to some backer board.

 

So we went to Lowe's and bought a crow bar. It took Stuart about all of 5 minutes to rip out the floor when we got home.


Then, I googled how to remove a toilet and sink and we took those puppies out. I swear, you can do any DIY project with the help of YouTube. And our toilet and sink sat on our front porch for at least 24 hours. Just keeping it klassy 'round here.


After removing the sink and toilet, we tackled the tile. Using the same crow bar tool that we removed the floors with, we used a hammer to get the crow bar down behind the tile and then yanked/pulled/hit the tile until it all fell down.



Unfortunately, one of our plaster walls came down with the tile. It literally crumbled before our eyes. But it's alright--we have some drywall that Stuart is hanging right now!

Our plans for putting the bathroom back together include the bit of drywall I mentioned, tiling the floor, hanging beadboard on the walls with molding and a chair rail, installing new light fixture and updating electrics, reinstalling our old toilet, and installing a new sink. The room will also get a new coat of paint and new hardware.


This picture reflects some of the supplies we have purchased for the project. Our supplies include:
  • 2 sheets of beadboard
  • 12' of chair rail
  • 12' of molding
  • 12' of quarter round
  • 21 sq ft of carrera marble hexagonal tile
  • dry wall
  • backer board to adhere tile to
  • tile mortar
  • tile grout
  • tile sealer
  • tile spacers
  • trowel
  • grout float
  • grout sponge
  • small nails
  • nail filler
  • new wax ring
  • new toilet seat
  • new toilet part (oops--we broke whatever part it is when removing the toilet)
  • new toilet handle
  • toilet paper holder
  • towel bar
  • light fixture
  • marble transition piece for tile to wood floor transition
  • paint (wall paint and molding high gloss paint)
  • level
  • multiple saws, screw drivers, wrenches, hammers, etc.
How do we know what we're doing, you might ask? We don't! We are learning as we go. We've made a friend named Jeris at our local Lowes who is VERY helpful! A real expert when it comes to tiling. And even though we didn't buy our tile at Lowes he said he would cut it for us--SCORE! Also, Lowes cut our beadboard, molding, quarter round, and chair rail for us while we were shopping. Double score. Now we are just waiting for our tile to arrive from Amazon to get started on the floor! Keep your fingers and toes crossed that we can put everything back together again.





Sunday, August 7, 2011

Shutter Headboard

Ever since Mr. Mull and I finished painting our 2nd guest bedroom mentioned here, we have been working to complete other projects in the room. Projects include (in a nutshell):
  • Paint and hang shutters to function as headboard
  • Sew curtains (4 panels) and hang hardware
  • Sew skirt for bedside table
  • Paint wooden door and saw horses to function as desk
  • Have glass cut for top of desk
  • Accessorize (lamps, pictures, wall decor, knick knacks, etc)
We decided to go ahead and cross the headboard off the list, since we have had the shutters since December and they have been waiting patiently to make their debut in the room. We bought the shutters for $30 at a little salvage place in Greenville, SC. Shutter headboards make a great alternative to a real headboard, as they were obviously very inexpensive and add some uniqueness to a room in place of your traditional headboard. In the post I mentioned above, the shutters were already positioned behind the headboard but they were not painted or hung. Thus, our first task was to paint them a high gloss white to match the room's molding and trim. So we lugged them outside (these jokers may look light, but don't let them fool you--they are heavy!) and propped them up on the saw horses that are later going to become our desk legs. Might as well get as much use out of those horses as we can...We tried to take a shortcut by using high gloss spray paint to cover the shutters (more on this later). We coated each shutter twice and gave them about an hour of drying time. 


Here is one shutter complete next to the other still awaiting paint. Although they looked white to begin with, you can see what a difference the coats of paint made. Before we painted each shutter, we arranged them how we wanted them once they were hung on the wall. We decided to alternate between the shutters closed up and down.



And below is a picture of our very imprecise attempt to find the wall studs. We have a battery powered stud finder that came in very handy when locating each stud. However, as you can see by the 6 (yikes) nail holes for our last stud, there were a few complications in locating the final one. Circling it helped us remember which hole was the stud. We made sure the nail holes were all along an even line by measuring down the same distance (9 3/4" ish) from the molding. Then we were ready to drill screws thru the shutters. The studs really dictated where we hung the shutters--we had to make sure that they were positioned in such a way that each shutter could be screwed into 2 studs since the shutters were wide enough to cover 4 of them. We drilled the first screw on the far right shutter and then measured our stud distance from that for the other screws.


Here is a close up of the shutters screwed to the wall. You can see the pencil line we used to mark where the stud was and make it easier to know the exact line we needed the screw to fall on.

 

And here is Mr. Mull after hanging the first shutter. He was SO proud of himself--the next morning after we were done with the project, I kid you not he asked "What are we doing tonight to the house? I want to use more tools." Typical boy. You can see in this picture based on where the screws are that the shutter fell along 2 studs.



And here are the shutters hung and the bed back in place. I mentioned that we tried to take a short cut by using high gloss spray paint on the shutters. Well, it looked very gray next to our high gloss paint paint, so we ended up painting the shutters again once hung on the wall with real high gloss paint. Oh well, the shortcut was worth a try!


I wanted the "headboard" to be really high and dramatic (I mean, as dramatic as a white headboard can possibly be). The accessorizing component of this room will include large, gray shams behind the white pillows to give some depth to the bed. Also, a tall table lamp like this little guy from Ikea will be a fun addition the the bedside table.



We bought some new sheets to coordinate with our new color scheme (and yes, there are other colors in this room besides gray and white, I promise!). I love the little gray detail along the top of the sheets and sides of each pillowcase.



And since I always want to keep you hanging around for the next project, here is a sneak peak at the material for the table skirt and pillow shams. I wanted something in a solid darker gray, but with a little pattern to keep things interesting. I found the fabric below at Mary Jo's cloth store in Gastonia, NC. If you're anywhere near the area, you MUST stop in! It is by far the best priced fabric store with the most selections that I have ever been in. And I'm no rookie when it comes to fabric stores. It is a wonderful place and truly fits the saying "if we don't have it, you don't need it". They have a little bit of everything.


So until next time, that is what's new at the Mull residence.

Have any questions about this post? Feel free to leave me a comment! And if you're reading along, I invite you to "Follow Me" or subscribe to the blog. I would love to know who all is following us out there!